Sample · not a client result
Sample case study: a release certification for a B2B SaaS launch
Sample · B2B SaaS
- Client
- A B2B SaaS company with 12 engineers (sample)Name withheld
- Industry
- B2B SaaS
- Services
- Release certification, Test automation
- Published
- Status
- SampleWritten for this page to show the format. The company and every number are illustrations, not a client's results.
01Client context
A sample team of 12 engineers ships a web app every two weeks. Before each release a product manager clicks through the main screens; nobody else tests. The next release adds a new billing page.
02Challenge
Two of the last five releases reached customers with a broken flow, found by a customer each time. The team wants a go/no-go call it can trust before the billing release, without slowing the two-week cycle.
03What we did
In the first two days a senior tester agreed the release checklist with the team: the 14 flows that take money, sign people up or change an account, each with its expected result.
On the release candidate they ran every flow on the browser and device pairs from the team's analytics, then the new billing page against its tickets. Each bug went into the team's tracker with a video, steps to reproduce, the build and a severity, and blockers went to Slack as soon as they were confirmed.
Two blockers held the release: an export that downloaded another workspace's invoices after a switch in a second tab, and a plan change that kept the old price. Both were fixed and retested on a new build. The go/no-go report listed what was tested, on which build, and the minor bugs left open with the reason each could wait.
In week two the six flows with the most bugs in the team's tracker were turned into automated tests that run on every merge, so the next release starts with them covered.
04Results
Sample · not a client resultWritten for this page to show the format. The company and every number are illustrations, not a client's results.
14flows
Critical flows tested on the release candidate
2-week certificationSample
2bugs
Blocker bugs found before the deploy
2-week certificationSample
24hours
Longest time from finding a bug to its full report
every bug in the 2 weeksSample
6flows
Critical flows added to the automated regression suite
by the end of week 2Sample
05Services used
- Release certificationWe test your release candidate against a checklist agreed with you and sign off a go/no-go report before you deploy to production: what was tested, on which build, and what must be fixed first.
- Test automationAn automation engineer writes Playwright or Cypress tests in your repo, runs them in your CI and keeps them working. Half a manual tester covers what automation can't, and overnight results are in your Slack before your workday starts.
Find out what your next release is hiding